|
|
|
|
|
Gondola preparation - w/o instrumentation |
Gondola with all MSFC equipment installed |
Brian Ramsey & Doug Huie checking HERO optics (black cylinder seen from the side, focal plane is to the right in this picture) |
|
|
|
| Kurt Dietz & Jeff Apple at the controls | Installing HERO mirrors. | Mirror Assemblies mounted alongside Star Camera |
|
|
|
| Details of Mirror Assembly mounts. | Details of Mirror Assembly mounts. | Details of Mirror Assembly mounts. |
|
|
|
| Laser for real-time adjustment of mirror alignment | Testing night-time pointing. | Preparation for calibration of the GPS attitude offset for rough pointing |
|
||
| Time for a relaxing diversion? |
|
Editor: Dr. Douglas Swartz System Administrator: Mr. Bob Dean |
|
|